Construction
HEALTH SECTOR PROJECTS
Linson in Health Sector Projects;
- As a manufacturer and contractor, Linson completes the construction of turnkey fully-fledged hospitals, clinics, infirmaries, mobile hospitals, mobile clinics, field hospitals etc. in every geography where effective and beneficial health services are needed.
- It completes the 16-storey (400 + 46) -bed Reinforced Concrete Training Hospital Project on a turnkey basis with traditional construction methods including all equipment in Basra, Iraq.
- It completed 4 general hospital projects with 160 bed capacity in Venezuela using hybrid construction method (Reinforced Concrete and Steel).
- It completes mobile surgical hospitals and first aid and emergency response station projects for the Ministries of Health, NATO, Defense Ministries, UN and NGOs in different parts of the world.
EDUCATION SECTOR PROJECTS
Linson in Education Sector Projects;
- In different regions of different countries and in any kind of geographical conditions, where high organizational skills are required; Linson is one of the first company that come to mind in the Education sector with its turnkey solutions, including infrastructure and superstructure for schools, classrooms, training centers.
- For the Ministry of National Education of Turkish Republic, 154 unparalleled prefabricated school and classroom projects are completed in different fields of 81 provinces of Turkey at same time. Linson undertook manufacturing, engineering, substructure and superstructure, equipment and furniture works.
- In the past 20 years, in more than 30 countries, many school, classroom and kindegarten projects have been completed on a turnkey basis using prefabricated modular building systems.
HOUSING PROJECTS
- Rapid Prefabricated Modular Mass Housing Projects
The most practical way to meet the emerging need for housing in cities due to the increasing population is the Rapid Prefabricated Modular Mass Housing Projects in which Linson Building System is used. These projects are oriented toward lower and middle income people in order to economically contribute to their social life with affordable prices.
- Low Cost Prefabricated Modular Housing Projects
Low-cost prefabricated modular housing projects of Linson; It is a housing construction method that reduces the cost with effective budgeting thanks to advanced skills and technology without compromising the robustness, performance and service life of the building. Since these projects are completed for low and middle income people, they also contribute to their social life with affordable prices.
- Medium and High Quality Housing Projects
Medium and High Quality Prefabricated Modular Housing project of Linson, is a quality oriented housing type that is a combination of high-level quality and affordable costs in the main building components such as heating-cooling, exterior and interior wall coverings, roof, lighting, floor covering, doors, windows, comfort, design. It is the most preferred residential building method.
HOTEL PROJECTS
Linson in Hotel Projects;
- Thanks to new generation building materials, fabrication methods and technologies, hotels and tourist accommodation structures that keep up with all kinds of geographical conditions and protect cultural texture are built with modular steel prefabricated building systems..
- Linson completed the Duqm City Hotel project, which is a three-star hotel project located in the industrial zone of Oman, which has been rapidly developing since 2010. Prefabricated Modular Light Steel and Heavy Steel Systems were used for the construction of the project. Project was completed according to the desert climate with a temperature resistance of +50 degrees. Linson carried out its design, superstructure, infrastructure and supply processes. The hotel has a total capacity of 120 beds and was completed in a short period of 180 days. In accordance with the request of the employer, reinforced concrete building appearance was preferred for the adaption to the architectural texture of Oman.
WAREHOUSES and HANGARS
Warehouses and hangars completed with Linson’s light and heavy steel structure systems are designed to process raw materials, products and all kinds of production items or use them specifically for purpose. These structures are frequently preferred by manufacturers, importers, exporters, wholesalers, shipping companies, customs etc. due to their high quality, reasonable cost and short construction period.
WATER TREATMENT FACILITY PROJECTS
- For the mega living and settlement facilities, village and town projects, worker and accommodation camps completed within the scope of Water Infrastructure Projects; Linson, as a contractor, realizes projects such as water supply, drainage and ventilation, hot-cold water systems, waste water treatment and storage, and sewage water treatment. In addition, within the scope of water treatment facility projects in Iraq, many steel construction water tank sheds and hangar projects have been completed.
Projects
Modular Student Residence and Study Commons
A proposed 180-bed modular student residence with bedroom clusters, shared kitchens, study commons, laundry and accessible accommodation.
Coastal Modular Eco-Resort Cabin Cluster
A proposed 24-key coastal cabin cluster with prefabricated guest rooms, accessible units, reception, housekeeping and back-of-house support.
Modular Site Office and Workforce Camp for a Mixed-Use Construction Project in Accra
Modular camp for 220 Accra project staff. Tight timeline, rainy humid weather & limited space make traditional temporary building unfeasible....
Modular Accommodation Camp for a Remote Mining Project in Western Australia
48 prefab modules hold 96 Pilbara mine workers. Insulated, rust-resistant pre-plumbed units install quickly for WA’s hot, dusty remote mining terra...
Hotel Mobile Room Case Study: How Modular Guest Rooms Deliver Comfort, Functionality, and Fast Deployment
This mobile unit is a prefab hotel room with bedroom, private bathroom, tub, sink, TV, cabinet, lighting and AC ventilation for guest lodging....
Overseas Mobile Housing Case Study: How Modular Units Achieve Fast Installation and Complete Living Functions
This overseas housing uses stackable modular boxes. Crane-mounted on site, they form multi-storey homes with full interiors and open kitchens....
Factory Facility Mobile House Case Study: How Modular Buildings Support Fast Industrial Space Construction
Modular box units form a two-story industrial factory building with corridors, stairs and complete ventilation systems.
Stadium Fan Zone Container Hospitality & Pop-up Service Units
Modular container units serve stadium events as kiosks, bars and catering service stations.
Waterfront Two-Story Container Showroom | Mobile Housing Case Study
Cape Town waterfront modular container showroom for luxury car brand pop-up events.
Urban Commercial Mobile House Project: Two-Story Modular Café, Restaurant and Retail Space
Two-story steel modular buildings serve as urban cafes, shops, showrooms and leisure commercial spaces.
Modular Worker Accommodation Camp Project in Riyadh, Saudi Arabia
Riyadh modular camp offers safe, tidy dormitories and sanitary facilities for construction and technical workers.
Modular Mobile Facilities for a High-Altitude Solar and Battery Energy Storage Project in Calama, Chile
26 prefab modules build a quick base for Chile Calama solar project, covering office, control and staff accommodation.
Heat-Resistant Modular Mining Camp in Australia: Rapid Accommodation for a Pilbara Iron Ore Project
Tom Price iron ore project adopts a 120-staff modular camp with sun shading, dust control, zoned cooling and standalone utilities
Extreme-Cold Modular Mining Camp in Mongolia: A 96-Person Workforce Accommodation Solution
Mongolia modular camp for 96 mining workers, insulated and freeze-resistant for quick setup in cold remote zones.
Modular Waterfront Vacation Hotel Case Study: Compact Resort Cabins Built for Coastal Living
2018 waterfront resort uses modular cabins for high-quality hotel construction, fitting complex coastal surroundings well.
Rapid Modular Hospital and Disaster Relief Settlement Housing Project
Fast-deploy modular units act as mobile hospitals and disaster shelters with integrated medical and living areas.