Our Services

  • • Field Research and Digital (Numeric) Measurements
  • • Conceptual Design and Feasibility Studies
  • • Front-End Engineering Design (FEED)
  • • Supply Chain Management
  • • Design, Manufacturing, Construction and Operation with Building Information Modeling (BIM)
  • – Superstructure and Infrastructure Design
  • – Building Production
  • – Construction Works
  • • Furnishing and Industrial Equipment
  • • Infrastructure Works
  • • Electric Power Generation Plants (Natural Gas and Diesel Generators, Solar Panels)
  • • Water and Sewage Treatment Systems
  • • Operation and Maintenance
  • • After Sales Services
Linson Services Before
Linson Services After

Design, Manufacturing, Construction and Operation with Building Information Modeling (BIM)

Linson's services begin with design and continue with manufacturing, construction and operation processes. We use Building Information Modeling (BIM) in all these processes. This enables us to create detailed 3D models that help in better planning, coordination, and execution of projects.

Our team of experts uses the latest BIM software to ensure that all aspects of the project are considered, from structural integrity to energy efficiency. This approach allows us to identify potential issues early in the design phase, reducing costly changes during construction.

Supply Chain Management

Linson has established a robust supply chain management system to ensure the timely delivery of materials and components. We work with trusted suppliers and partners to source high-quality materials at competitive prices.

Our supply chain management process includes strategic sourcing, inventory management, logistics coordination, and quality control. This ensures that all materials meet our strict standards and are delivered to the project site on schedule.

We also implement sustainable practices in our supply chain, such as reducing waste and minimizing our environmental footprint. This commitment to sustainability extends to all aspects of our operations.

Building Production and Infrastructure Works

Linson specializes in the production of prefabricated building components and the construction of infrastructure works. Our state-of-the-art manufacturing facilities enable us to produce high-quality components with precision and efficiency.

We use advanced manufacturing techniques to ensure that all components meet the highest standards of quality and durability. This allows us to complete projects faster and with greater accuracy than traditional construction methods.

Our infrastructure works include site preparation, utilities installation, and the construction of roads, bridges, and other essential infrastructure. We have the expertise and equipment to handle projects of any size and complexity.

Site Plans, Infrastructure Works and Facilities

Linson provides comprehensive site planning services to ensure that all aspects of a project are carefully considered. We work closely with clients to develop site plans that maximize functionality and efficiency.

Our infrastructure works include the design and construction of utilities, roads, and other essential services. We also specialize in the development of facilities such as accommodation camps, industrial buildings, and commercial spaces.

We use the latest technology and best practices to ensure that all infrastructure works and facilities are built to the highest standards. Our team of experts has extensive experience in managing complex projects in challenging environments.

Testing and Commissioning

Linson provides comprehensive testing and commissioning services to ensure that all systems and components are functioning properly. We use advanced testing equipment and techniques to verify the performance of all building systems.

Our testing and commissioning process includes functional testing, performance testing, and quality assurance. This ensures that all systems meet the required specifications and performance standards. We also provide training to client personnel on the operation and maintenance of all systems.

Building Maintenance and Support Services

Linson offers comprehensive building maintenance and support services to ensure that all facilities remain in optimal condition. We provide regular maintenance programs tailored to the specific needs of each facility.

Our maintenance services include preventive maintenance, corrective maintenance, and emergency repairs. We also provide technical support and troubleshooting services to address any issues that may arise.

After Sales Services

Linson is committed to providing excellent after sales services to ensure client satisfaction. We offer a range of after sales services, including warranty support, technical assistance, and spare parts supply.

Our after sales team is available to address any questions or concerns that clients may have. We also provide regular follow-up services to ensure that all systems and facilities are functioning properly.

We believe that our relationship with clients extends beyond the completion of a project. We are committed to providing ongoing support to ensure the long-term success of all projects.