Our Reference Projects
Portable Booth Mobile House Case Study: How Modular Booths Support Urban Security and Police Service
Fast deployment,Recognizable exterior design,Suitable for urban public service
Urban Commercial Mobile House Project: Two-Story Modular Café, Restaurant and Retail Space
two-story mobile house with rooftop terrace
Modular Mobile Camp for a 120 MW Solar Power Project in Almería, Spain
Renewable Energy Infrastructure / Solar Power Construction Camp / Modular Site Buildings
Coastal Wind Farm Modular Building Case Study in Esbjerg, Denmark
Temporary offices, worker accommodation, control room, meeting room, dining area, changing room and equipment storage for a coastal wind power construction site.
Modular Worker Accommodation Camp Project in Riyadh, Saudi Arabia
Rapid deployment, large-capacity accommodation, modular expansion
Modular Natural Gas Pipeline Construction Camp in Arzew, Algeria
Modular camp designed for a natural gas pipeline construction team Functional capacity for approximately 120 workers and engineers
High-Altitude Modular Copper Mining Camp near Calama, Chile
High altitude, strong UV radiation, high winds, cold nights, dry air, airborne mineral dust and limited water resources
Tropical Modular Mining Camp in Guinea: Rapid Workforce Accommodation for a Remote Bauxite Project
Tropical-climate design, elevated foundations, enhanced rainwater drainage, corrosion protection, insect control, independent utilities and rapid installation
Modular Mobile Facilities for a 180 MW Wind Farm Project in Antofagasta, Chile
Renewable Energy / Wind Power Infrastructure / Remote Modular Buildings
Modular Accommodation Camp for Oil & Gas Pipeline Construction in Basra, Iraq (2024)
Fast Installation 、Desert Climate Ready
Modular Mobile Facilities for a High-Altitude Solar and Battery Energy Storage Project in Calama, Chile
Relocatable modular mobile buildings assembled from factory-prefabricated steel modules
Heat-Resistant Modular Mining Camp in Australia: Rapid Accommodation for a Pilbara Iron Ore Project
Extreme-heat adaptation, dust-control design, solar shading, zoned air-conditioning, maintenance support rooms, independent utilities and rapid installation
COUNTRIES WE COMPLETED PROJECTS
OUR PROJECTS
- General Contracting
- Worker / Labor Accommodation Camps
- Military & Base Camps
- Hotel & Holiday Villages
- Refugee, Emergency & Earthquake Camps
- Mobile Hospitals
- Workshop & Warehouse & Storage
- Latrine Units (WC & Shower)
- Residential Housing
- Student Dormitory
- Office / Embassy / Administrative Buildings
- Vehicle Inspection Stations
- Police Station & Prison
- Modular Office & Accommodation Modular Units