Modular Accommodation Camp for Desert Oilfield Drilling Operations in Saudi Arabia

Modular Accommodation Camp for Desert Oilfield Drilling Operations in Saudi Arabia

Photo Gallery

Modular Accommodation Camp for Desert Oilfield Drilling Operations in Saudi ArabiaModular Accommodation Camp for Desert Oilfield Drilling Operations in Saudi ArabiaModular Accommodation Camp for Desert Oilfield Drilling Operations in Saudi ArabiaModular Accommodation Camp for Desert Oilfield Drilling Operations in Saudi ArabiaModular Accommodation Camp for Desert Oilfield Drilling Operations in Saudi Arabia

Background


As drilling activities expanded across multiple well pads, the project owner required a temporary but high-quality living environment for engineers, drilling crews, maintenance teams, and management personnel.


The isolated location made conventional construction both time-consuming and expensive. Modular construction was selected to improve project efficiency while maintaining consistent building quality under harsh desert conditions.

Scope of Supply

380-person accommodation units

Administration offices

Conference building

Dining hall

Industrial kitchen

Medical clinic

Prayer room

Laundry building

Shower and restroom facilities

Recreation center

Engineering Highlights


The camp adopted galvanized steel structural frames combined with insulated sandwich wall panels to improve thermal efficiency under extreme desert temperatures.


Roof systems were reinforced with reflective coatings to reduce solar heat gain. HVAC systems were optimized for continuous cooling performance, ensuring comfortable indoor conditions throughout the year.


Modules were fully prefabricated with integrated electrical, plumbing, HVAC, lighting, and fire protection systems before transportation to the project site.

Project Results

Installation completed approximately 40% faster than traditional construction.

Factory prefabrication rate exceeded 90%.

The camp successfully supported continuous drilling operations for more than 18 months.

Energy-efficient insulation reduced cooling energy consumption throughout the summer.

The modular buildings remain reusable for future drilling projects after relocation.

Why Modular Buildings for Desert Oilfield Projects?


Oilfield developments in desert environments demand rapid deployment, durable construction, and efficient climate control. Modular buildings provide a practical solution by reducing on-site work, improving installation speed, and delivering reliable accommodation for large workforces under extreme environmental conditions.

Project Detail

  • Khurais Oil Field, Eastern Province, Saudi Arabia
  • May 2024 – December 2024

Sector

oil-and-gas

Share Post

Information Request Form