



Completed in September 2026 in Mendoza, Argentina, this facility was delivered around a distinct operating workflow. The laboratory was completed beside the production winery so grape and wine samples move from covered receiving to preparation, analysis, sensory review and controlled archive without crossing office work.
Neutral lighting and isolated tasting booths support consistent sensory work, while stainless preparation benches and washable finishes handle routine laboratory use. The archive maintains a separate temperature zone for retained samples.
Structural openings, equipment loads, primary service routes, lifting points and module junctions were resolved before interior close-up. Factory records covered concealed work, penetration sealing, dimensions and transport protection.
Service penetrations, water quality, drainage and ventilation were inspected before laboratory equipment was installed. Final commissioning followed the sample journey rather than accepting rooms only by finish.
Foundations, utility entries and crane positions were checked before dispatch. Modules were placed in sequence, connections and weather seals were completed, and specialist rooms were tested against their intended use.
The ICC/MBI off-site standards programme is a useful reference for dividing factory and site responsibilities where adopted. Final structural, fire, accessibility, energy and operational approvals remain subject to the local authority and appointed professionals.
Explore ZH-ENG modular building solutions for manufacturing, logistics and delivery coordination matched to the project type.
Project source: linson.
Technical reference: International Code Council and Modular Building Institute — Off-Site Construction Standards — https://www.iccsafe.org/products-and-services/standards/is-osmc/