



Direct answer: A modular administration and staff-support facility beside a refrigerated distribution warehouse, with dispatch, quality, changing and welfare rooms.
Final dimensions, quantities and performance remain subject to site verification and local approval.
Direct answer: The layout separates public or clean functions from deliveries, plant, waste and maintenance access, with direct emergency egress.
Direct answer: The project brief coordinates structure, fire lines, ventilation, power, water, drainage, data, lifting points and inter-module seals.
Direct answer: Factory checks cover dimensions, finishes, concealed services, pressure tests, electrical tests, door operation and serialized image records.
Direct answer: Foundations, external utilities, crane planning, fire strategy, accessibility and statutory inspections were confirmed for the selected location.
Direct answer: Handover includes drawings, asset schedules, test records, manuals, spare-parts guidance, cleaning requirements and staff training.
Direct answer: Provide site, occupancy, room schedule, climate, loads, utilities, logistics and approval route. Review ZH-ENG modular solutions before finalizing the configuration.