Completed in September 2026 in Cape Town, South Africa, this project was handed over around a specific operating workflow. The clinic was completed as a working veterinary base with shaded animal intake, examination, treatment, quarantine recovery and feed preparation. Separate routes reduce contact between new arrivals and recovering animals.
Washable finishes, floor drainage and controlled ventilation suit routine wildlife care. Quiet recovery rooms are separated from preparation and storage, while the service yard supports safe transfer and cleaning.
Structural openings, equipment loads, primary service routes, lifting points and module junctions were coordinated before interior close-up. Factory records covered concealed work, penetration sealing, dimensions and transport protection.
The team tested water, drainage, ventilation and isolation-room operation with the clinic workflow. Equipment, feed and medical storage were commissioned as functional zones, not generic rooms.
Foundations, utility entries and crane positions were checked before dispatch. Modules were set in sequence, weather seals and service connections were completed, and specialist rooms were tested against their actual use.
The ICC/MBI off-site standards programme is a useful reference for assigning factory and site responsibilities where adopted. Final structural, fire, accessibility, energy and operational approvals remain subject to local authorities and appointed professionals.
Explore ZH-ENG modular building solutions for manufacturing, logistics and delivery coordination matched to the project type.