



Completed in October 2026 in Wellington, New Zealand, this project was handed over around a specific operating workflow. The campus brings costume work, prop fabrication, editing and production coordination into a reusable modular arrangement beside the filming stage. Loading access serves noisy workshop functions without crossing quiet post-production rooms.
Acoustic separation and flexible power/data grids distinguish the editing suites from the fabrication areas. Wide service doors, durable floors and organized stores support changing production demands.
Structural openings, equipment loads, primary service routes, lifting points and module junctions were coordinated before interior close-up. Factory records covered concealed work, penetration sealing, dimensions and transport protection.
The completed spaces were tested through a production-day scenario covering deliveries, workshop use, media transfer and secure close-down. Acoustic checks and network resilience formed part of the final handover.
Foundations, utility entries and crane positions were checked before dispatch. Modules were set in sequence, weather seals and service connections were completed, and specialist rooms were tested against their actual use.
The ICC/MBI off-site standards programme is a useful reference for assigning factory and site responsibilities where adopted. Final structural, fire, accessibility, energy and operational approvals remain subject to local authorities and appointed professionals.
Explore ZH-ENG modular building solutions for manufacturing, logistics and delivery coordination matched to the project type.
Project source: linson.
Technical reference: International Code Council and Modular Building Institute — Off-Site Construction Standards — https://www.iccsafe.org/products-and-services/standards/is-osmc/