Modular Building Institute
ATCO announced a CAD 179 million contract for a 1,052-person dormitory lodge and offices at the Stibnite Gold Project near Yellow Pine, Idaho. The plan uses 363 prefabricated units, with manufacturing and site preparation beginning in late 2025 and installation scheduled from 2026.
The published source establishes the named programme, procurement or industry development and the figures stated above. It does not remove the need to review the current tender documents, adopted rules or project-specific conditions.
Remote workforce housing is a logistics and operations system, not just a room count. Dining, recreation, circulation, utilities and transport sequencing have to be coordinated with the mine construction schedule.
Project teams should record the destination jurisdiction, operating duty, interfaces, acceptance evidence and delivery boundary before production. A related technical reference is available from the ICC/MBI off-site standards programme.
The procurement lesson is practical: a buyer comparing a remote modular workforce housing needs verified drawings, conditions and approval requirements, not a catalogue match alone. ZH-ENG can support documented component or modular-building discussions through its relevant solution range, with final compatibility and compliance confirmed against the project record.
Future amendments, measured project results or authority guidance may change the commercial reading. Buyers should retain the source version and later updates in the procurement file.
Modular Building Institute — ATCO Wins $179 Million Remote Workforce Housing Contract in Idaho