
From February 17 to 19, 2026, our team participated in the NAHB International Builders’ Show at the Orange County Convention Center in Orlando, Florida. Organized by the National Association of Home Builders, IBS is a major international event serving professionals across the residential and light-construction industries.
The exhibition brought together home builders, developers, architects, designers, remodelers, manufacturers, material suppliers, technology providers and construction professionals. It provided an extensive platform for examining new residential products, building systems, digital technologies and construction methods.
IBS 2026 was held together with the Kitchen & Bath Industry Show as part of Design & Construction Week. Before the event, NAHB projected that the two exhibitions would feature more than 2,350 exhibiting brands across approximately 1.2 million square feet of net exhibition space. NAHB official announcement

The residential construction industry is seeking ways to improve productivity while responding to housing affordability, skilled-labor shortages, energy-performance requirements and changing customer expectations.
Factory-built housing, modular construction and other offsite building methods can move a significant portion of construction into a controlled production environment. This approach can improve process consistency, reduce exposure to adverse site conditions and support more predictable project schedules.
However, production speed alone does not determine project success. Structural compliance, energy performance, transportation, installation, local approvals, supply-chain coordination and long-term maintenance must be considered together.
Our participation in IBS 2026 allowed us to study these requirements within the broader North American residential construction market and exchange ideas with professionals from different parts of the building industry.

One of the most relevant areas for factory-built housing professionals was the Pro Builder Show Village, located in the outdoor exhibition area behind the West Hall of the Orange County Convention Center.
Unlike a conventional exhibition booth that displays individual samples, Show Village presented completed factory-built homes in a real-scale environment. Visitors could enter the homes, examine the layouts and observe how building products were integrated into complete residential spaces.
The 2026 village included manufactured homes, emerging building materials, live product demonstrations and construction training. Its model-home lineup included three homes from Cavco, one from Champion Homes and a fully equipped accommodation tent. Pro Builder Show Village guide
This full-scale format made it easier to evaluate exterior design, interior finishes, room proportions, circulation, product integration and overall residential quality.

During the exhibition, our team focused on technologies and solutions relevant to international manufactured, modular and prefabricated building projects.
The displayed homes demonstrated how standardized manufacturing can be combined with different exterior styles, floor plans and interior configurations. This balance between standardization and customization is particularly important for housing projects that require both production efficiency and market adaptability.
We examined wall systems, insulation, windows, doors, roofing, air-sealing products and moisture-control solutions. These components directly influence indoor comfort, energy consumption, durability and maintenance costs.
The completed homes provided practical examples of flooring, wall finishes, countertops, cabinets, sanitary products and other interior materials. Evaluating these products in an actual residential setting gives a clearer understanding of their visual quality and installation performance.
Live demonstrations and training sessions showed how tools, fastening systems, sealants and installation techniques can improve workmanship and jobsite efficiency.
Digital design, project coordination, automation, smart controls and energy-management technologies are becoming increasingly relevant to modern housing projects. These systems can improve design accuracy, operating convenience and building performance.
Affordable housing cannot be evaluated only through the purchase price of the building unit. Site preparation, foundations, transportation, lifting, installation, utility connections, permits, financing and operating costs all affect the final cost.
Factory-built construction can support cost control, but the greatest value is achieved when design, production and on-site delivery are coordinated from the beginning.
Buyers and developers increasingly pay attention to insulation, glazing, air leakage, thermal bridges, moisture management and heating and cooling efficiency.
For international projects, the building envelope must be adapted to the destination climate. A housing system suitable for a warm and humid region may require substantial changes before it can be used in a cold, dry or high-wind environment.
Modern factory-built homes are increasingly assessed by their daylight, ventilation, acoustic comfort, storage, accessibility, indoor air quality and interior design—not only by their production speed.
This creates opportunities for suppliers that can combine manufacturing efficiency with comfortable and attractive residential design.
A high-performance home depends on how different systems work together. Wall panels, insulation, windows, roofing, ventilation and mechanical equipment must be coordinated rather than selected independently.
The full-size homes at Pro Builder Show Village made this system-based approach easier to observe and evaluate.
Factory-built housing is increasingly presented alongside conventional residential construction products, smart-home technologies, energy-efficient materials and professional building services.
This indicates that offsite construction is not an isolated building category. It is becoming part of a broader residential construction ecosystem.
Although these terms are sometimes used together, they can have different regulatory meanings.
In the United States, a manufactured home generally refers to a factory-built residence constructed under the federal HUD Code. A modular home is also produced in factory sections, but it normally complies with the state or local building codes applicable at its final installation location.
Portable buildings, container-based buildings and relocatable structures may follow other standards depending on their intended application, occupancy and installation period.
For this reason, project location, intended use and regulatory pathway should be confirmed before a product is designed or quoted.
Our project process begins with an assessment of the customer’s actual requirements. We evaluate location, climate, application, capacity, floor plan, applicable standards, transportation conditions, installation resources and expected service life.
Depending on the project, a factory-built housing package may include:
Early engineering coordination helps reduce design conflicts, improve production accuracy and create a more predictable delivery process.

Our participation in the 2026 NAHB International Builders’ Show and Pro Builder Show Village strengthened our understanding of North American residential construction, factory-built housing and building-product innovation.
We will continue improving our product configurations, engineering documentation, manufacturing processes, quality control, export packaging and international project-support capabilities.
If you are planning a manufactured housing community, modular accommodation facility, workforce housing project, resort cabin development or other prefabricated building project, contact our team with the location, application, quantity, preliminary layout and applicable standards. We can help evaluate a suitable building configuration and delivery plan.

The NAHB International Builders’ Show is an annual trade event for residential and light-construction professionals. It features building products, construction systems, education programs, live demonstrations and industry networking.
IBS 2026 was held from February 17 to 19, 2026, at the Orange County Convention Center in Orlando, Florida. Official IBS information
Pro Builder Show Village was the anchor of the IBS Outdoor Exhibits. It featured full-size factory-built homes, building materials, product demonstrations, construction training and industry networking. Official Show Village website
The village featured several completed manufactured homes and an equipped accommodation tent. Visitors could enter the buildings and examine their layouts, materials, finishes and construction details.
Full-size homes allow buyers to evaluate room dimensions, circulation, daylight, finishes, building-product integration and overall construction quality more clearly than drawings or small samples.
Yes. Floor plans, structural systems, insulation, finishes, doors, windows and building-service provisions can be adjusted. Any customization should be evaluated against local codes, climate, transportation limitations, installation methods and budget.
A useful quotation normally requires the project location, intended use, quantity, required dimensions, floor plan, climate conditions, material preferences, applicable standards, delivery destination and installation method.